Section 8. Special Conditions of Contract
The following Special Conditions of Contract (SCC) shall supplement the General Conditions of Contract (GCC). Whenever there is a conflict, the provisions herein shall prevail over those in the GCC.
|
GCC Clause Reference |
Special Conditions |
|
GCC 1.1 |
The Employer is ____________________ The Engineer is ____________________ The name and procurement reference number of the Contract is ______________________________________________________. The Works consist of _____________________________________. The Site is located at __________ and is defined in Drawings Nos.: _______________. The Start Date shall be __________. The Intended Completion Date for the whole of the Works shall be __________. |
|
GCC 2.3 |
The following documents also form part of the Contract: ____________________________________________________________ |
|
GCC 4.1 |
The Employer’s specific approval is required for: |
|
GCC 8.1 |
The Schedule of Other Contractors __________ part of the Contract |
|
GCC 9.1 |
The Schedule of Key Personnel __________ part of the Contract |
|
GCC 11.1 |
The Employer’s risks are as specified in the GCC. |
|
GCC 13.1 |
The minimum insurance cover and deductibles shall be: (a) The minimum cover for insurance of the Works, Plant and Materials is __________. (b) The maximum deductible for insurance of the Works, Plant and Materials is __________. (c) The minimum cover for insurance of Equipment is __________. (d) The maximum deductible for insurance of Equipment is __________. (e) The minimum cover for insurance of property is __________ (f) The maximum deductible for insurance of property is _________ (g) The minimum cover for personal injury or death insurance is __________ with no deductible. |
|
GCC 14.1 |
Site Investigation Report(s) __________ part of the contract. |
|
GCC 25.2 |
Fees and types of reimbursable expenses to be paid to the Adjudicator are: __________. |
|
GCC 25.3 |
The institution whose arbitration procedures shall be used is: __________. Arbitration shall take place at: _______________ |
|
GCC 26.1 |
The Appointing Authority for the Adjudicator is: _______________. |
|
GCC 27.1 |
The Contractor shall submit a revised Program for the Works within __________ days of delivery of the Notice of Acceptance. |
|
GCC 27.3 |
The period between Program updates is __________ days. The amount to be withheld for late submission of an updated Program is __________. |
|
GCC 35.1 |
The Defects Liability Period is __________ days. |
|
GCC 37.1 |
This Contract is a _______________ Contract. |
|
GCC 44.1(l) |
The following events shall also be Compensation Events: |
|
GCC 45.1 |
The Engineer shall not adjust the Contract Price if taxes, duties and other levies are changed that subsequently affect the Contract Price. |
|
GCC 47.1 |
The Contract __________ subject to price adjustment in accordance with Clause 47 of the Conditions of Contract. |
|
GCC 48.1 |
The proportion of payments retained is __________ percent. |
|
GCC 49.1 |
The liquidated damages for the whole of the Works are __________ of the final Contract Price per day. The maximum amount of liquidated damages for the whole of the Works is __________ percent of the final Contract Price. |
|
GCC 50.1 |
The Bonus for the whole of the Works is __________ percent of final Contract Price per day. The maximum amount of Bonus for the whole of the Works is __________ percent of the final Contract Price. |
|
GCC 51.1 |
The Advance Payment will be equivalent to __________ percent of the Contract Price and will be paid in Ethiopian Birr. It will be paid to the Contractor no later than __________. |
|
GCC 51.3 |
The Advance Payment will be repaid by deducting proportionate amounts from each payment certificate during the period starting __________ months after the Start Date and ending __________ months after the Start Date. |
|
GCC 52.1 |
The Contract Security shall be for __________ of the Contract Price: |
|
GCC 58.1 |
The date by which operating and maintenance manuals are required is __________. The date by which "as built" drawings are required is __________. |
|
GCC 58.2 |
The amount to be withheld for failing to produce "as built" drawings and/or operating and maintenance manuals by the date required is __________ Ethiopian Birr. |
|
GCC 60.1 |
The percentage to apply to the value of the work not completed, representing the Employer’s additional cost for completing the Works, is __________. |