Contents
1. List of Goods and Related Services
2. Delivery and Completion Schedule
3. Technical Specifications and Compliance Sheet
4. Drawings
|
Procurement Reference Number: |
|
Item Number |
Description of Goods |
Quantity |
Unit of Measure |
|
1 |
|||
|
2 |
|||
|
3 |
|||
|
4 |
|||
|
5 |
|||
|
6 |
|||
|
7 |
|||
|
8 |
|||
|
9 |
|||
|
10 |
|||
The commodity specific conditions are attached and will form an integral part of any resulting contract.
Delivery and Completion Schedule
The delivery or completion period shall commence from the date of contract award.
Refer to Incoterms in the Special Conditions of Contract for the interpretation of the delivery period.
|
Item Number |
Description of Goods |
Delivery Completion period |
Delivery Point/Site |
|
1 |
|||
|
2 |
|||
|
3 |
|||
|
4 |
|||
|
5 |
|||
|
6 |
|||
|
7 |
|||
|
8 |
|||
|
9 |
|||
|
10 |
|||
Technical Specifications and Compliance Sheet
Procurement Reference Number:
Column b states the minimum technical specification of the item(s) required by the Procuring Entity.
The Bidder is to complete column c with the technical specification of the item(s) offered and to state whether the offered items "comply" or do "not comply" giving details of the areas of non-compliance.
|
Item No. |
Technical Specification of items required |
Compliance of specification |
|
a |
b |
c |
|
1 |
|
|
|
2 |
|
|
|
3 |
|
|
|
4 |
|
|
|
5 |
|
|
|
6 |
|
|
|
7 |
|
|
|
8 |
|
|
|
9 |
|
|
|
10 |
|
|
|
|
The detailed technical evaluation will examine the technical specification of the items offered in column c and determine or verify whether this meets the minimum specification required in column b. Bidders must complete column c or the bid will be rejected. Bidders are required to include technical literature to support the details provided in column c.
Drawings
Procurement Reference Number:
|
List of related Drawings |
||
|
Drawing number |
Drawing name |
Purpose |
|
|
||
|
|
||
|
|
||
|
|
||
|
|
||
|
|
||
|
|
||